THE CHALLENGE

Corridors are planned around infrastructure (bridges, clearances) but not the rolling stock and maintenance capacity needed to move heavy forces; the Baltic 1520 mm network and Rail Baltica 1435 mm leave an interface gap.

PROPOSED ACTION

Helvetica Light is an easy-to-read font, with tall and narrow letters, that works well on almost every site.

RESPONSIBLE STAKEHOLDERS

European Commission, particularly DG DEFIS

TIMELINE

24 months

TARGET

Latvian (as Eastern border of NATO), Lithuanian or Polish node designated and funded; heavy-flatcar and recovery-wagon specification agreed by at least 3 Member States.